Bus Boarding Station

Project:

Bus Boarding Station

Material Used:

Polymer Wet-Set Replaceable (cast-in-place)

Location:

Tukwila, WA

Sound Transit needed to replace the transition tiles at a bus transfer station. The original tiles installed by a competitor were 2’ x 4’ cast-in-place rib-design composite. TufTile was chosen to provide its 2’ x 2’ polymer cast-in-place (replaceable) tiles for the install. This product was chosen based on its replaceability design feature. With guidance from TufTile, over 220 linear feet (110 tiles) were installed. The project was executed on time. Sound Transit was very happy with the results and has used TufTile for other projects since that time.